ok little update, the wheels are back and the new tyres have been fitted.
I spoke to Corey at Quattronics about my tyres shredding on the inside and he showed me a set of these
they are great, a real quality piece of kit, and should stop ,me screwing tyres in 4k miles.
the bushes are going on at the minute aswel as a super high powered battery which is under all my ice eek*
check out the race inspired copper pipe bonnet stay, lol
then its got to have the tracking done and an MOT then a bloody good polish,
not much to do then lol
cheers to the lads at Quattronics for doing a top job on the cupra so far