Day 10
I took the day off of work (Thursday and Friday (German Bank holidays so no worries there)) to get the project moving again after no progress last week as the Phirm were in Wales for the weekend.
Not too many photos today (Thursday) but huge steps in progress. It is starting to look like an engine again!
Stating with the bottom end with the pistons and rods dropped into place:
And bringing the head downstairs:
It was time to marry the two together (Till death do they part?):
Using these beauties:
Lubricating the threads and the heads of the bolts allowed a certain smooth motion for ease in torquing. Spark plugs in (cages bent so they sit 0.5mm from the ceramic):
Done.
Flip the engine over:
After more cleaning, it was time to fit all of the oil sprayers (no blockages confirmed) and the Journal bearings (lubricating the interaction surfaces that engage with the crank):
After realising that we were one new big end rod bearing down, we decided to refit the crank and work around it to fit the bearing when it arrives.
Covered to avoid debris and more cleaning.
I did also fit the new (baffled) sump and the end plate (after seal change) you can see on top of the microfibre cloth. But weirdly, no photo.
Also fitted the aux plate, alternator (new pulley), new water pump, thermostat housing, knock sensors and sized up the turbo. New fixings are required though as the Pro 4 manifold makes it impossible to use an Allen key...
Turned the engine back over, dropped the old cam cover on to protect from debris.
Plan for tomorrow is to fit the Cam belt, fit the new cam cover, attach the rods to the crank, attach the remaining aux components to the block, all other engine internals, sump on properly and clean the engine bay of the Leon ready for fitment! Might be tight on time so I am arriving at 8.30 and there is always Saturday if necessary.
Hurray, nearly engine!
I'll be sure to get more images tomorrow. Was busy today.
Cheers, Ash
I took the day off of work (Thursday and Friday (German Bank holidays so no worries there)) to get the project moving again after no progress last week as the Phirm were in Wales for the weekend.
Not too many photos today (Thursday) but huge steps in progress. It is starting to look like an engine again!
Stating with the bottom end with the pistons and rods dropped into place:
And bringing the head downstairs:
It was time to marry the two together (Till death do they part?):
Using these beauties:
Lubricating the threads and the heads of the bolts allowed a certain smooth motion for ease in torquing. Spark plugs in (cages bent so they sit 0.5mm from the ceramic):
Done.
Flip the engine over:
After more cleaning, it was time to fit all of the oil sprayers (no blockages confirmed) and the Journal bearings (lubricating the interaction surfaces that engage with the crank):
After realising that we were one new big end rod bearing down, we decided to refit the crank and work around it to fit the bearing when it arrives.
Covered to avoid debris and more cleaning.
I did also fit the new (baffled) sump and the end plate (after seal change) you can see on top of the microfibre cloth. But weirdly, no photo.
Also fitted the aux plate, alternator (new pulley), new water pump, thermostat housing, knock sensors and sized up the turbo. New fixings are required though as the Pro 4 manifold makes it impossible to use an Allen key...
Turned the engine back over, dropped the old cam cover on to protect from debris.
Plan for tomorrow is to fit the Cam belt, fit the new cam cover, attach the rods to the crank, attach the remaining aux components to the block, all other engine internals, sump on properly and clean the engine bay of the Leon ready for fitment! Might be tight on time so I am arriving at 8.30 and there is always Saturday if necessary.
Hurray, nearly engine!
I'll be sure to get more images tomorrow. Was busy today.
Cheers, Ash
Last edited: