Getting there with the manifold...
So i got home early this week, i went with the missus to the hospital for a scan today, everything was good, really happy.
I managed to sneak into the garage around dinner time and got cracking on the manifold build.
I wanted to get the collector finished so cracked on with that.
Because of the position of the turbo i couldn't use a perfect v for the second collector, i had to use a slightly offset one.
I moved the angle on the chop saw until i got what i thought was right and after loads of moving it around and clamping i started to cut it, i cut the pipe right through at an angle so i could use both parts and turn them round so the angles met together, took ages but just took my time and battled on.
I dressed the ends up i tacked them together, then mounted it in the chopsaw to cut the end off.
After i chopped the end off -
I then cut the ends to length and started hammering the end into a square shape, then tacked it onto the flange....... took ages to get it right but im happy with the end result.
You can see the angle of one tube is almost straight - that was to give more clearance to the rocker cover -
Inside shots -
Once i have finished final welding the collector up i will us a die grinder and smooth out the inside of the collector just to take the edges off.
Feeling quite happy with myself i decided to use so trusty cable ties on the flange and just try it in position -
I then decided i needed to make a brace to set the position of the collector in relation to the head flange so i could start playing around with the headers on my spare cylinder head.
I found a couple of lengths of m6 stainless studding so used them....
First bit on -
Break for pictures..........