Elliott's MK3 Ibiza Cupra Update * carnage has begun*

Pipework is finished and fitted to see if it lines up etc.

81e43c9f.jpg


56134896.jpg


98e6663e.jpg


a430c476.jpg


And this is the valve you remove when fitting a catch tank yes?

843310d3.jpg


Waiting on catch tank, braided lines and inlet insulator gasket from bill and the gear to wire the battery in the boot.
 
Last edited:

joehirth

Rate me up baby
Apr 19, 2010
1,896
3
Woking, Surrey
www.facebook.com
Yeah you removed the PCV valve there ;) good man :). Hope you had a good Christmas and New Year, pipe work looks really neat - might be something I will do when going BT not decided yet. Who welded it all up?
 
Thanks Joe, Robbie, had a good festive period apart from I had two weeks off work and no parts to fit because of Christmas delays!

Pipework I welded up myself, handy when your a fabricator ;-), made the battery tray too. I bought all the bends from exhaust parts uk, there was plenty length in all of them to get around the bay, got plenty of off cuts left.

Thinking of going custom tip now just need to work out the sizes.
 

joehirth

Rate me up baby
Apr 19, 2010
1,896
3
Woking, Surrey
www.facebook.com
Thanks Joe, Robbie, had a good festive period apart from I had two weeks off work and no parts to fit because of Christmas delays!

Pipework I welded up myself, handy when your a fabricator ;-), made the battery tray too. I bought all the bends from exhaust parts uk, there was plenty length in all of them to get around the bay, got plenty of off cuts left.

Thinking of going custom tip now just need to work out the sizes.

If you want some pointers on custom TIP I used Robbie's design and tweaked it, let me know if you want measurements. Nice welding ;)
 
Jan 8, 2007
2,958
1
Wiltshire
Mine will be for sale within the next few weeks, though it now uses the very bottom section of a Forge TIP which is blue vs the rest above the ali reducer which is in black
 
Chris Knott Insurance - Competitive quotes for forum members