Popped down to see Si and Paul today to catch up with the progress on the car. As said a couple of days ago, the new engine mounts have been made and the engine is now sitting in it's final place.
The new mounts have made it possible to gain valuble space between the turbo and the bulkhead.
I've taken a couple of pictures to update the thread.
The 16v gearbox has been fully rebuilt using a TDi gearset. The Peloquin diff is now built in with a new bolt kit. The box casing has been powdercoated to match the rest of the engine.
The engine is now in it's final place. TB has been test fitted to work out the cable route etc.
With using the new mounts it's allowed for more room at the bulkhead.
The new gearbox mount bracket. It'll be going off to the powdercoaters all with the other side and various other bits and pieces including the alternator, strut brace.
New Aeromotive adjustable fuel pressure regulator.