I've stated my engin bay tidy up/catch tank fitting/battery relocation this week. It's very slow progress so my cars likely to be off the road for a while :-(.
The PCV pipe work and it replacement.
The expected splits and holes in the PCV pipe work
I bought the catch tank from Phillc so to get it to fit the battery needs moving.
All striped waiting for the cable!
CAD for the braket to hold the catch tank.
The bracket is a little rough around the edges so I'll re visit it at some point!
Hoping to get a little more done this weekend but I've got a fault on my phone line and no 3G at home so will be a while before I can get some more photos up!